All the wood parts to make the Ray Malmstrom GB Trainer
NO HARDWARE SUPPLIED
The original plan and instructions can be downloaded from Outerzone here :- https://outerzone.co.uk/plan_details.asp?ID=2631
THE KIT DIFFERS FROM THE ORIGINAL
Engine mount 19mm bearer spacing with 3 degree offset (suits Redfin engines)
Bellcrank recess lengthened to use the DMS BCHA Half A Crank & Horn
Leadout Rake increased
1/64 in ply doublers provided for fuselage
Redfin engine mounts, bellcranks and 5cc TR tanks all available on my site